The latest XCMG/Schwing V7 electric concrete mixer truck



A pic of the 8×4 watercart ready to leave the factory for New Zealand, it will be arriving in Auckland very soon!

A video of some final testing of the watercart around the factory compound.
https://youtu.be/2cJMlUhoiPU

XCMG’s first fully electric ECH (empty container handler) has similar duration and charging times to the reach stacker; 8-10 hours on a charge that takes 90 minutes.

Heavy electrics aren’t just trucks – this is XCMG’s latest fully electric reach stacker. Operating duration is 8-10 hours on a charge that takes 90 minutes.
